Execution of the full scope of project works with TPP.
Fuel – sunflower husk.
Equipment composition:
- 1 boiler 52 t / year steam;
- Turbogenerator 10.4 MW.
Execution of the full scope of project works with TPP.
Fuel – sunflower husk.
Equipment composition:
Poltava, Ukraine